Websites, bookings and operations for hotels

A hotel website in 2-3 weeks The design is rarely what takes the time. What takes the time is waiting for photos, copy and passwords.

A website for a hotel with 10 to 30 rooms, in one or two languages, can be live in two or three weeks. It isn't magic: it's a small project, with few pages and clear decisions. But the timeline depends far more on the hotel than on the designer. If the material is ready on day one, the deadline holds. If you have to wait for the photos or the booking engine password, it slips. The size of the hotel and the number of languages count too: with five languages or forty different rooms, it's a different timeline.

Material

What the hotel needs to have ready

Before you start, it helps to gather this:

WhatWhy
Good photos of rooms and common areasWithout photos, nobody can lay out the pages or settle the design.
Copy or details for each roomSize, beds, views, bathroom, how many people it sleeps.
Rates and policiesCancellation, breakfast, pets, check-in and check-out times.
Logins for the booking engine or PMSTo connect the book button and test it.
Domain and legal detailsWho holds the domain, company name and number, VAT number, privacy and cookie policy.

If you don't have copy, loose notes are enough: whoever builds the website can write it up. Hotel website brief template.

Timeline

A rough timeline

More or less, on a small project: week 1, a meeting, the material, the page structure and a first design for the home page; week 2, every page laid out with real copy and photos, booking engine connected; week 3, the hotel's review, corrections, the second language, testing on mobile and going live. It's a guide, not a promise: more languages or more pages mean more time. How a hotel website is created.

Delays

What usually delays the project

  • Waiting for materialIt's almost always this: photos, copy or rates that don't arrive.
  • Approvals between several partnersEach one gives their opinion at a different moment.
  • Lost passwordsFor the domain, the booking engine or the old hosting.
  • Changing your mind halfwayNew pages or a new style in week 2.
  • Photos that don't workDark, small or ten years old.
Decisions

One person who decides

The trick that speeds up a project most is having a single person at the hotel who replies and signs things off. They can check with the partners, but they send back one list of changes, not five different emails. And it's worth agreeing two review rounds from the start: one on the design and one with everything built. Who looks after the hotel website.

Later

What to leave for a second phase

  • Blog and local guidesBetter done well later than rushed now.
  • Third and fourth languagesStart with English and the language most of your overseas guests speak.
  • Events or wedding pagesUnless they are your main business.
  • New photosIf a shoot is planned, they can be swapped in later without touching the design.
  • Offers and packagesAdd them once the website is working.
Minimum

The minimum to go live

To launch, a short website is enough: home page, rooms, location, contact and a working book button, plus the privacy and cookie pages. Everything else can grow later. A first hotel website with 5 pages and cookies and legal pages.

Example

A typical case: a 14-room country hotel in the Cotswolds

The hotel wanted its new website before Easter and had five weeks left. On day one it sent the photos from a recent shoot, a spreadsheet with the details of each room and the booking engine logins. The website was ready in three weeks in English and French. German and a walking routes page were left for later, once it was already taking bookings.

Mistakes

Common mistakes

  • Starting without photosYou design blind and then have to redo it.
  • Wanting every page from day oneIt adds weeks to the project.
  • Not testing the booking engine before going liveThe book button is the most important thing.
  • Going live without checking on mobileThat's where almost everyone arrives.
Steps

What to do, step by step

1. Put photos, room details and rates in one folder.

2. Find the logins for the domain and the booking engine.

3. Name one person who decides.

4. Agree what goes in now and what waits for the second phase.

5. Check everything on your phone before going live. After launch: website maintenance.

Gonzalo Baeza
Can I help?

I'm Gonzalo. I ran hotels for more than five years, from small properties to remote lodges, and now I build websites for them. Can I help with your hotel or your website? Write to me at gonzalo@hotelcrafted.com. I answer myself, usually within one business day.

FAQ

Questions hoteliers ask us.

Can a hotel website be built in two weeks?+

For a small hotel, with few pages and the material ready, it can be; it's normal to allow two or three weeks, and more if there are many languages or rooms.

What delays a hotel website project most?+

Almost always waiting for the hotel's material (photos, copy, rates, passwords) and approvals between several partners.

What do I need before we start?+

Good photos, details for each room, rates and policies, logins for the booking engine, the domain, and the details for your privacy and cookie policy.

What can I leave for later?+

The blog, extra languages, events pages, offers and packages.

Keep reading

More on hotel websites.

Free review

Want me to look at your website? I'll tell you 3 things I'd change.

Free and by email, within one business day. No calls, no pressure.

we read every email

Prefer email? Send your website link to gonzalo@hotelcrafted.com and I'll reply with 3 things I would change. I answer myself, within one business day. No calls, no newsletter.